Abstract:

This paper describes the performance of a three-phase grid-tied 30.05kWp photovoltaic (PV) system on the rooftop of a high rise building in Singapore. The PV system consists of an array of 15.05kWp Mono-crystalline panels and another of 15kWp Poly-crystalline panels. They are arranged in 6 strings and are set up on the same roof top. This paper looks into the performance ratio and the capacity utilization factor CUF) over a 4 month period from March 2010 to June 2010. The PV system has achieved a high performance ratio of 81.8{6e6090cdd558c53a8bc18225ef4499fead9160abd3419ad4f137e902b483c465}. The remaining 18.2{6e6090cdd558c53a8bc18225ef4499fead9160abd3419ad4f137e902b483c465} of the incident solar energy in the analysis period that is not converted into usable energy can be attributed to factors such as pre-photovoltaic losses, module and thermal losses along the balance of system (BOS) and system losses. The CUF is calculated to be 15.32{6e6090cdd558c53a8bc18225ef4499fead9160abd3419ad4f137e902b483c465}. This paper discusses the PV system installation and the considerations taken during the design and installation phase such that a high performance ratio is achieved.

Keywords: Solar energy, Photovoltaic, mono-crystalline, poly-crystalline, grid-tied, renewable energy, tropical

Price: $0.00

Loading Updating cart...
LoadingUpdating...